Baxi Potterton 21 SL Service Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
27
11.0 SERVICING
11 .1 Annual Servicing
1. For reasons of safety and economy, it is
recommended that the boiler is serviced annually.
Servicing must be performed by a competent person.
2. After servicing, complete the relevant Service
Interval record section of the Benchmark
Commissioning Checklist at the rear of this
publication.
3. Ensure that the boiler is cool.
4. Ensure that both the gas and electrical
supplies to the boiler are isolated.
5. Slacken the screws securing the facia panel. Lift
the outercase panel so that its securing tabs are clear
of the facia. Remove the panel (Fig. 47).
6. Remove the screws securing the inner door panel.
Lift the panel slightly to disengage it from the studs
on top of the case (Fig. 48).
7. Note the positions of the two sensing tubes on the
outlet elbow and three wires on the fan motor and
remove them (Fig. 49).
8. Slacken the screws on the outlet sealing collar.
Ease the collar upwards as far as possible (Fig. 50).
9. Remove the four screws securing the combustion
box door and remove the door (Fig. 48).
Fig. 47
Fig. 48
Fig. 49
Fig. 50
Facia Panel
Fan Wires
Fan
Sensing Tubes
Outlet Sealing
Collar
Case Front Panel
Combustion
Box Door
Inner Door
Panel
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 47 48

Comments to this Manuals

No comments